Raleigh Historic and Conservation Overlays: What Exterior Work Needs City Approval

Pick one of Raleigh's 30 historic and neighborhood conservation districts and a job such as a new roof, windows or a fence, and see whether it needs a certificate of appropriateness, whether staff can approve it, and how the process runs.

Updated

A roofer on a ladder replaces shingles on a restored Victorian house with a wraparound porch behind a white picket fence

Raleigh asks for city approval before some exterior jobs, and which jobs depends on which overlay the property sits in. Choose your district and your job and the checker tells you whether the work needs a certificate, whether staff can sign it off, or whether the district only regulates lot and building measures.

Check a job against a district

General historicStreetside historicNeighborhood conservation

30named districts in the city's layer, drawn as 33 shapes
8of them historic overlays, and 22 neighborhood conservation overlays
75of our businesses have a pin inside one of these lines, 15 of them in Moore Square

Three overlays, three different rulebooks

General historic

Any exterior part of a building or structure, including masonry walls, fences, light fixtures, steps and pavement, needs a certificate of appropriateness before it is erected, altered, restored, moved or demolished. The Historic Development Commission decides, and its committee does the work (Sec. 5.4.1 and 10.2.15).

Streetside historic

The same rules, applied only to the parts of a property seen from the street: the strip between the street and the front facade, the first half of the existing building's depth, any addition that projects past the old footprint, and new buildings (Sec. 5.4.2).

Neighborhood conservation

No certificate. The overlay sets measures for the neighborhood, such as lot size, setbacks, height, paved areas and lot width. Changes must follow them unless the Board of Adjustment grants a special use permit, and not for growth above 25 percent of the original floor area (Sec. 5.4.3).

From application to approval

  1. The owner appliesThe applicant has to be the property owner or someone holding a lease, an option or a contract to buy. A designer or contractor can be named as the project contact, but the application is not theirs to file.
  2. Staff checks the fileAn application staff finds incomplete is treated as not filed and waits until the missing pieces arrive.
  3. Minor work goes to staffThe city says applications generally take 10 business days. Staff can approve but cannot deny. If the work looks substantial or precedent-setting, it is converted to major work.
  4. Major work goes to a public hearingThe COA Committee can approve, approve with conditions, defer or deny, and must act within 180 days of filing. The city says the commission typically meets on the fourth Thursday of each month at 5 p.m. The applicant carries the burden of showing the work fits.
  5. The clock startsA certificate expires 12 months after the decision unless the work has substantially begun, and expires again if work stops for 12 months. An approval by staff can be appealed to the COA Committee within 30 days.

A certificate never stands in for other permits. The ordinance says it does not relieve the applicant, contractor, tenant or owner from getting any other permit the job needs.

All 30 districts in the city's layer

The date is the effective date the layer gives for the zoning case, and the last column counts businesses from our lists whose pin falls inside the line.

DistrictKindIn effect sinceZoning caseOur businesses inside
Blount StreetGeneral historic overlayMay 10, 1976Z-15-19763
Boylan HeightsGeneral historic overlayNovember 21, 1984Z-124-19841
Capitol SquareGeneral historic overlayMay 10, 1976Z-13-19765
Moore SquareGeneral historic overlayMay 5, 1992Z-21-199215
OakwoodGeneral historic overlayJune 23, 1975Z-18-19755
Oberlin VillageGeneral historic overlayFebruary 6, 2018Z-30-20171
Prince HallGeneral historic overlayMay 1, 2012Z-21-20111
Glenwood-BrooklynStreetside historic overlayApril 5, 2016Z-2-20163
Brookhaven (North)Neighborhood conservation overlaySeptember 7, 1993Z-29-19933
Brookhaven (South)Neighborhood conservation overlaySeptember 7, 1993Z-28-19932
Cameron Park (Core)Neighborhood conservation overlayApril 4, 2006Z-62-20050
Cameron Park (Transition)Neighborhood conservation overlayApril 4, 2006Z-62-20052
Five Points East (Core)Neighborhood conservation overlayOctober 5, 2004Z-50-20043
FoxcroftNeighborhood conservation overlayOctober 1, 2002Z-46-20021
Glen ForestNeighborhood conservation overlayMarch 7, 1995Z-2-19952
King Charles (South)Neighborhood conservation overlayNovember 1, 2005Z-73-20041
Laurel HillsNeighborhood conservation overlayApril 7, 1998Z-1-19980
Mordecai 1Neighborhood conservation overlayFebruary 7, 1995Z-73-19941
Mordecai 2Neighborhood conservation overlayFebruary 7, 1995 and laterZ-61-2005, Z-73-19947
New Bern - EdentonNeighborhood conservation overlaySeptember 15, 1992 and laterZ-33-1992, Z-39-19976
North BoylanNeighborhood conservation overlaySeptember 1, 1998Z-63-199812
North HillsNeighborhood conservation overlayFebruary 6, 2018Z-33-20170
North Ridge SouthNeighborhood conservation overlayDecember 6, 2016Z-26-20160
North Ridge WestNeighborhood conservation overlayJanuary 22, 2019Z-33-20180
Oakwood ParkNeighborhood conservation overlayOctober 3, 2000Z-79-20000
Oberlin VillageNeighborhood conservation overlayNovember 8, 1995Z-83-19950
Roylene AcresNeighborhood conservation overlayAugust 4, 1992Z-34-19921
RunnymedeNeighborhood conservation overlayDecember 11, 1990Z-60-19900
South ParkNeighborhood conservation overlayOctober 16, 2007Z-30-20070
TrailwoodNeighborhood conservation overlayJune 1, 1999Z-40-19990

What to ask before a crew starts

Is the address inside a district, and which kind?

Look the address up with City Planning before you collect bids. The layer used here was last edited on January 22, 2019, so a district created since then may be missing from it, and Historic Landmarks on single properties are not part of it at all.

Who is filing the certificate application?

If a contractor offers to handle it, find out that your name is on it as owner, and ask to see the approved certificate and its dates before work begins.

Does the price assume staff approval?

A job on the minor works list can be settled in days. A job that goes to the committee can take months, and the committee can attach conditions. Ask the contractor which path the quote assumes.

Is a like-for-like repair really like for like?

The exemption covers ordinary maintenance or repair that changes nothing in design, material or outer appearance. Swapping wood for vinyl is a change in material even if the shape is identical.

To compare roofers, fence builders or window companies, start from roofing companies, fence companies and window replacement companies, and ask each one about overlay experience. Where these rules and our other sources come from is on how we pick businesses.

What this checker cannot decide

It reads the city's ordinance and its published minor works list. It does not know your house, whether a feature is character-defining, the design guidelines for your district or the fee for an application. Only City Planning can say how it applies to a specific property.

Sources read on November 18, 2026

City of Raleigh Unified Development Ordinance Sec. 5.4.1, 5.4.2, 5.4.3 and 10.2.15, the city's pages on the certificate of appropriateness and its minor work process, and the city's Character Protection Overlays layer.